Quantcast
Channel: Sitabus.it
Viewing all articles
Browse latest Browse all 210

Milan Subway – Line M5

$
0
0

Line M5 Milan MetroLine M5 of the Milan Subway is distinguished by the lilac color  used for logo, the map and the decoration of stations and trains.

Currently, line M5 is under construction. Once finished, it connects the city from the north (Bignami terminus) to the west (San Siro Stadio terminus).

Interchanges
Line M5 of Milan Metro crosses line M3 at stop Zara, line M2 and lines S1, S2, S5, S6, S7, S8, S11, S13 at stop Garibaldi FS. Once finished, it crosses line M1 at stop Lotto and linea S3, S4 at stop Domodossola.

Opening hours
Line M5 of Milan Metro is active from 6am to 0:00am. The frequency of the trains varies on average from 2 to 4 minutes.

Stations
Lilac line M5 of Milan Metro has no branches.

Map of line M5 of Milan Subway

Map of line M5 of Milan Subway

 

The first part, between Bignami and Zara, was opened in 2013 and the second part, between Zara and Garibaldi, in 2014. The completion of the third part (Garibaldi-San Siro Stadio) is planned in 2015.

The line will have 19 stations. Currently only the part Bignami-Garibaldi Fs is active.

Bignami
Ponale
Bicocca
Ca’ Granda
Istria
Marche
Zara
Isola
Garibaldi FS

Under construction: scheduled to open in 2015
Monumentale
Cenisio
Gerusalemme
Domodossola FN
Tre Torri
Portello
Lotto
Segesta
San Siro Ippodromo
San Siro Stadio

The post Milan Subway – Line M5 appeared first on Sitabus.it.


Viewing all articles
Browse latest Browse all 210

Trending Articles